TWIN OAKS VALLEY
DIVERSION STRUCTURE
Owner: San Diego County Water Authority
$10-15 Million
San Marcos, CA

Project Photos


The Diversion Structure is part of the San Diego County Water Authority’s Second Aqueduct and serves as a constant head reservoir supplying untreated water to Pipeline 5 in the Second Aqueduct and serving member agencies in central and south county service areas.

The Diversion Structure is a 22 million-gallon capacity, reinforced concrete tank, approximately 30 feet in height and all but the upper three to five feet buried, with the concrete roof exposed. The landscaping plan is designed to reduce the visual impacts of any exposed areas. Construction of the structure required an eight-day shutdown of Pipelines 3 and 5 and an additional eight-day shutdown of Pipeline 3 to tie-in these pipelines to the Diversion Structure—both shutdowns were successfully accomplished with no impact on water supply to the county.